OVN Engineers — Est. 1949
Generators

Generator installation.

Home, commercial and industrial generator installation across Delhi NCR. One team handles sizing, civil work, electrical tie-in, acoustic treatment and commissioning.

  • Home backup
  • Commercial
  • Industrial
  • CPCB IV+
  • Turnkey
Outdoor diesel generator installation with acoustic enclosure
Twin DG installation under a roofed shelter
Containerised diesel generator enclosure
Multi-genset plant installation with stainless exhaust ducts
Industrial generator with bulk diesel storage tank
OVN-branded gensets in industrial DG hall
How it works

Six things every install gets.

When the power goes out, your home or business shouldn’t be filled with darkness. We install generators that fit into your life like a silent backup — ready to switch on within seconds.

We don’t just drop a genset and disappear. From suggesting the right size for your load to installing it safely into your existing electrical system, our engineers and technicians take every measure to make the install go smoothly and the equipment run reliably for years.

What's included

Turnkey means all six stages.

Correct sizing first

We measure your actual connected load and suggest the right KVA — neither oversized (wasteful) nor undersized (tripping).

Civil & foundation

Designed to spec — vibration isolation, cable ducts, exhaust routing, fuel tank foundation. Nothing is left to chance.

Acoustic enclosure

CPCB-compliant acoustic enclosures keep noise well within residential limits. We've done low-noise urban installs for hotels and homes.

Electrical tie-in

Integration with your distribution panel, AMF and — where needed — synchronizing panels. Tested for auto-start behaviour before handover.

Compliance checks

CPCB IV+ genset compliance and pollution control where required.

Home-to-industrial

Same install team covers a 10 kVA home backup and a 2,000 kVA factory feed. The quality standard doesn't change with size.

Frequently asked questions

I just want a generator for my house. Is that too small for you?

Not at all. We install home gensets from 10 kVA upwards all the time — silent backup units that fit into residential life without being heard.

What does 'turnkey' actually include?

Load survey → genset and panel selection → civil work → delivery → installation → electrical tie-in → commissioning → staff training → handover and final documents. You get a running genset, not a box.

How long does a typical installation take?

For a residential install: 3–7 days depending on civil work. For a 500+ kVA commercial install: 2–4 weeks depending on site readiness and panel lead time.

Planning a generator install?

Tell us your connected load and site — we'll recommend a KVA and quote end-to-end.