Generator load test: prove the DG can carry the load.

A standby generator that only ever runs off-load has not been tested. A stepped load test shows whether it holds voltage and frequency at rated output — and burns off the deposits that light running leaves behind.

  • Stepped load
  • kW, PF, V, Hz recorded
  • Wet stacking check
  • Written report

When to test

Three situations that call for a load test.

Standby sets that rarely see real load

A generator that only runs for a few minutes on no load each week has never proved it can carry the building. A periodic load test does.

After installation or a major repair

Commissioning, an overhaul, an alternator rewind or a new AMF panel — test on load before you rely on it.

Signs of wet stacking

Black oily residue at the exhaust, smoke on load pick-up, or rising oil consumption on a set that mostly runs lightly loaded.

How it is done

A stepped DG load test, in four stages.

1. Connect the load

A resistive load bank is connected to the generator output, or the test uses the site's own load where it is large and steady enough.

2. Step the load up

Load is applied in steps — for example quarter, half, three-quarter and full rated load — and held at each step until temperatures settle.

3. Record at every step

kW, kVA and power factor, voltage and frequency per phase, current per phase, oil pressure, coolant temperature and exhaust condition.

4. Check recovery and report

Watch voltage and frequency dip and recover as load is added and removed, then compare every reading against the manufacturer's data and write up the result.

Underloading

Why light running damages a diesel.

Diesel engines are built to work. Run one for long periods well below its rating and it never gets hot enough to burn all its fuel. The leftovers — unburnt fuel, soot and oil — collect in the exhaust and cylinders. This is usually called wet stacking.

Over time it shows as black, oily residue at the exhaust joints, smoke when load is picked up, and higher oil consumption. A load test at rated output, done regularly, shows whether it has started and helps clear it. Sizing matters too — a set far larger than the load it actually carries will spend its life underloaded; our generator sizing calculator helps check that.

Test sheet

What to record at each load step.

  • Load step (% of rating) and time held
  • kW, kVA and power factor
  • Voltage and frequency, per phase
  • Current per phase and phase unbalance
  • Oil pressure and coolant temperature
  • Exhaust colour, abnormal noise or vibration
  • Fuel used during the test, where measured
  • Any alarm, trip or shutdown

A load test belongs in the diesel generator maintenance checklist and can be scheduled as part of a generator AMC.

Log every run, not just the test

See the DG's real loading every day.

A Titan energy meter on the generator records load, power factor, voltage, frequency and run hours on every run — so you can see whether the set is regularly underloaded long before the next test.

Frequently asked questions

What is a generator load test?

A test that runs the generator at known loads, usually stepped up to its rated output, while voltage, frequency, power factor and engine readings are recorded. It proves the set can actually carry the load it is rated for, which a no-load run does not.

What is wet stacking?

When a diesel engine runs for long periods on no or light load, it does not reach full operating temperature, so some fuel does not burn completely. Unburnt fuel and carbon collect in the exhaust and engine, showing as black oily residue and smoke. Regular running on a proper load helps prevent it.

How often should a DG set be load tested?

It depends on how the set is used and on the manufacturer's and your site's requirements. Standby sets that rarely carry real load benefit most from periodic load testing; we can suggest a schedule after looking at the set's run history.

Do we need to shut the site down for a load test?

Not usually. With a load bank the generator is tested on its own output, so the building can stay on mains. The test is planned with your facility team around the changeover.

Can the readings be logged automatically?

Yes. A Titan energy meter on the generator output logs kW, power factor, voltage and frequency throughout the test, and can read engine values from the genset controller, so the report is built from recorded data rather than spot readings.

Book a generator load test.

Tell us the DG rating, make and location — we'll plan the test and the load arrangement with you.